HomeAbout DachengHistorical Events in CSP

Aug, 2010: Start to build the Parabolic Trough concentrator

Oct, 2010: Start to build the Linear Fresnel concentrator

Jan, 2011: Completed the first group of 150 meters Trough concentrator

Mar, 2011: Completed two groups of 96 meters Linear Fresnel solar concentrators

Jun, 2011: The first group of Parabolic Trough system produced steam

Jul, 2011: Start to build the second group of Trough concentrator

Oct, 2011: Completed 2nd group of 150 meters Trough concentrators installation

Dec, 2011: Start to install oil tanks,heat exchangers and other auxiliary equipment. Connected all the pipes

Mar, 2012: Filled all the conductor oil into the system

Apr, 23, 2012: Built up Concentrated Solar Thermal Demonstration Park

May, 9, 2012: Parabolic Trough and Linear Fresnel Concentrated Solar Power system generated power successfully and connected to Grid